Please share your requirements with us and let’s discuss how we can best meet your needs. You can contact us through our website, email, or phone at any time. We look forward to collaborating with you!
Product Description:
A one-component coating composed of chlorinated rubber resin as the main film-forming substance. The construction is simple, convenient and fast.
Product Use:
Anti-corrosion topcoat for steel structures with low surface requirements in moderately corrosive environments.
Physical Parameters:
Color: various colors
Volume solid content: 50±2%
Standard film thickness: Dry film: 40 microns Wet film: 87 microns
Theoretical coating rate: 8.5㎡/kg, 11.5㎡/L (based on 40 micron dry film)
Actual Coverage Rate: Consider Appropriate Loss Factors
Flash point: 37±2℃(after mixing)
Construction Instructions:
Surface Preparation: Surface Preparation: All surfaces to be coated should be clean, dry and free of contamination. Prior to painting, all surfaces should be qualified and treated in accordance with ISO 8504:2000 standards. Before painting, the surface of the object to be coated must be cleaned to prevent the presence of moisture, dust and other contaminants to ensure the adhesion of the paint film.
Application: This product is packaged in individual cans. After opening the can, stir well before use. It is recommended to use spraying construction.
Thinner: JINYU No. 2 Thinner
Construction method: | airless spray | air spray (with pressure tank) | brush/roller |
Dilution ratio: | 0-5% | 5-10% | 0-5% |
Airless spray:
Nozzle size: 0.38-0.53mm
Discharge pressure: 15MPa
Drying Time:
(Wet film thickness 87μm, relative humidity 50%) | 15℃ | 25℃ | 35℃ |
Fingers dry to touch | 1H | 30 Min | 20 Min |
Transportable | 30H | 27H | 16H |
fully cured | 10 days | 7 days | 5 days |
Recoat interval:
(Wet film thickness 87μm, relative humidity 50%) | 15℃ | 25℃ | 35℃ |
shortest | 24H | 18H | 12H |
longest | No Limit |
The above data are for guidance only. The actual drying time/time interval before overcoating can be longer or shorter, depending on the thickness of the paint film, ventilation conditions, humidity, underlying paint, advance loading and unloading requirements, mechanical strength, etc.
Packing specifications: 20KG/group
Product Description:
A one-component coating composed of chlorinated rubber resin as the main film-forming substance. The construction is simple, convenient and fast.
Product Use:
Anti-corrosion topcoat for steel structures with low surface requirements in moderately corrosive environments.
Physical Parameters:
Color: various colors
Volume solid content: 50±2%
Standard film thickness: Dry film: 40 microns Wet film: 87 microns
Theoretical coating rate: 8.5㎡/kg, 11.5㎡/L (based on 40 micron dry film)
Actual Coverage Rate: Consider Appropriate Loss Factors
Flash point: 37±2℃(after mixing)
Construction Instructions:
Surface Preparation: Surface Preparation: All surfaces to be coated should be clean, dry and free of contamination. Prior to painting, all surfaces should be qualified and treated in accordance with ISO 8504:2000 standards. Before painting, the surface of the object to be coated must be cleaned to prevent the presence of moisture, dust and other contaminants to ensure the adhesion of the paint film.
Application: This product is packaged in individual cans. After opening the can, stir well before use. It is recommended to use spraying construction.
Thinner: JINYU No. 2 Thinner
Construction method: | airless spray | air spray (with pressure tank) | brush/roller |
Dilution ratio: | 0-5% | 5-10% | 0-5% |
Airless spray:
Nozzle size: 0.38-0.53mm
Discharge pressure: 15MPa
Drying Time:
(Wet film thickness 87μm, relative humidity 50%) | 15℃ | 25℃ | 35℃ |
Fingers dry to touch | 1H | 30 Min | 20 Min |
Transportable | 30H | 27H | 16H |
fully cured | 10 days | 7 days | 5 days |
Recoat interval:
(Wet film thickness 87μm, relative humidity 50%) | 15℃ | 25℃ | 35℃ |
shortest | 24H | 18H | 12H |
longest | No Limit |
The above data are for guidance only. The actual drying time/time interval before overcoating can be longer or shorter, depending on the thickness of the paint film, ventilation conditions, humidity, underlying paint, advance loading and unloading requirements, mechanical strength, etc.
Packing specifications: 20KG/group