Please share your requirements with us and let’s discuss how we can best meet your needs. You can contact us through our website, email, or phone at any time. We look forward to collaborating with you!
Availability: | |||||||||
---|---|---|---|---|---|---|---|---|---|
Quantity: | |||||||||
Product Description:
Introducing the GT-NSP-FP1.50-BTCB-2 Indoor Intumescent Steel Structure Fire Retardant Paint, a state-of-the-art solution engineered to provide unparalleled fire protection for steel structures. This advanced paint system combines cutting-edge technology with exceptional performance, offering a comprehensive range of features and benefits.
Designed to withstand the most demanding fire conditions, GT-NSP-FP1.50-BTCB-2 provides robust protection against ordinary building fiber fires. Its intumescent properties enable it to expand when exposed to heat, forming a protective barrier that insulates the steel structure and prevents the spread of flames.
Key features of GT-NSP-FP1.50-BTCB-2 include its water-based formulation, which makes it environmentally friendly, non-toxic, and pollution-free. The paint boasts a thin thickness, ensuring strong adhesion to steel surfaces while maintaining high fire resistance. Its white color does not chemically react with standard anti-corrosion primers, and it emits no irritating odor during application.
Main Feature:
GT-NSP-Fp1.50-BTCB-2 indoor intumescent steel structure fire retardant coating, a testament to cutting-edge innovation in fire protection technology. Crafted as a water-based solution, it sets a new standard with its thin application, unparalleled adhesion, exceptional fire resistance, and aesthetic appeal.
Designed with environmental sustainability in mind, our coating embodies eco-friendly principles while delivering top-notch performance. Its thin application ensures minimal material usage without compromising on efficacy, making it a cost-effective and efficient solution for safeguarding indoor steel structures against fire hazards.
One of its standout features is its strong adhesion properties, ensuring a seamless bond to steel surfaces for long-lasting protection. In the event of a fire, our coating forms a robust insulating char layer, effectively retarding the spread of flames and preserving structural integrity.
Beyond its fire-retardant capabilities, our coating also offers decorative properties, enhancing the visual appeal of indoor spaces while providing essential safety measures. Its versatility makes it suitable for a wide range of applications, from commercial buildings to industrial facilities.
In summary, our GT-NSP-Fp1.50-BTCB-2 indoor intumescent steel structure fire retardant coating represents a groundbreaking advancement in fire protection technology. Combining innovation, sustainability, and versatility, it's the ultimate choice for safeguarding indoor steel structures in a wide variety of environments.
Base treatment and construction methods:
1. Substrate treatment
1.1 Surface treatment of steel structures is the basic condition to ensure the durability of fire retardant coatings. According to different base materials, the surface treatment of steel structures should be as follows:
1.1.1 New ordinary steel structure surface
After the steel structure surface is sandblasted and derusted, a matching anti-rust and anti-corrosion coating is applied. It is recommended to use an epoxy zinc-rich primer + epoxy mica iron intermediate paint system.
1.1.2 Galvanized steel surface
In order to ensure good bonding performance with fire retardant coatings, epoxy coating transition paint must be used before construction.
1.1.3 Old steel structure or old primer surface
If the primer is not damaged and the surface is clean, check the compatibility of the fire retardant coating and the primer; if there is no primer or the primer is seriously damaged, the anti-corrosion coating must be removed and repainted before construction.
1.2 Before construction, thoroughly check whether the steel parts are painted with anti-rust paint, whether there is dust or oil stains, and whether there are cracks and improper welding on the steel beams and columns. Construction can begin only after the inspection shows that there are no problems.
1.3 Steel parts that have not been rust-proofed must be rust-proofed (this process is generally the responsibility of the user).
2. Apply fire retardant paint
2.1 When opening the packaging on site, you must use an electric stirrer to stir until the consistency is uniform. If the material is too thick, add a small amount of neutral water until it is suitable for brushing, but it should not exceed 5% of the paint volume.
2.2 This coating can be applied by brush or roller. Each pass should be applied alternately horizontally and vertically to ensure it is even and smooth.
2.3 Construction temperature and humidity requirements
When applying this paint, it should be used between 5~35℃ and relative humidity ≤80%. High humidity or low temperature will prolong drying time and cause poor film adhesion and reduction of other properties.
2.4 The coating thickness during the first pass of construction shall not exceed 0.2mm.
2.5 After the first coat is basically dry, apply the next coat until the specified thickness is reached. The thickness of each dry film should not be greater than 0.2mm (wet film 0.2-0.3mm).
2.6 Under normal temperature conditions, the interval between each construction should be more than 12 hours; if the temperature is too high or too low, the construction interval can be adjusted appropriately.
2.7 During the use of this product, it is recommended to use alkali-free fiberglass cloth for wrapping. When the coating is constructed to a thickness of about 0.8mm (dry film), wrap the alkali-free fiberglass mesh cloth, with an overlap of 5-10cm between meshes, and add Use a spatula behind the net to compact the net in one direction, paying attention to the compaction of the corners and joints. The next step of construction can only be carried out after full compaction and ensuring that there are no hollow areas.
2.8 High humidity and low gas flow or low steel temperature may cause condensation on the steel, resulting in poor adhesion of the paint, or even cracking, rolling, and peeling.
2.Construction steps and operating points:
3.1 Substrate treatment 3.2. First coat of paint 3.3. Second to nth layer construction 3.4. Self-inspection
Customer Reviews:
"Outstanding Fire Protection": "We've been using GT-NSP-FP1.50-BTCB-2 for our indoor steel structures, and we're incredibly impressed with its fire-retardant capabilities. It provides outstanding protection while maintaining a sleek finish."
"Reliable and Trustworthy": "Working with this fire retardant paint has been a game-changer for our projects. Not only does GT-NSP-FP1.50-BTCB-2 deliver on its promises of fire resistance, but the team behind it has been reliable and trustworthy, ensuring smooth transactions and timely deliveries."
"Excellent Durability": "GT-NSP-FP1.50-BTCB-2 has proven to be an excellent choice for our indoor steel structures. Not only does it offer top-notch fire protection, but its durability is also exceptional. We've seen minimal wear and tear even in high-traffic areas."
"Great Aesthetic Appeal": "One of the things we love about GT-NSP-FP1.50-BTCB-2 is its ability to provide both fire protection and aesthetic appeal. The finish is smooth and sleek, adding to the overall visual appeal of our steel structures."
"Efficient Application and Coverage": "We've found GT-NSP-FP1.50-BTCB-2 to be highly efficient in terms of application and coverage. It goes on smoothly and evenly, and a little goes a long way. This has not only saved us time but also reduced costs."
These are hypothetical testimonials based on the features and advantages of the product. If you need further assistance or want more tailored testimonials, feel free to ask!
Product Description:
Introducing the GT-NSP-FP1.50-BTCB-2 Indoor Intumescent Steel Structure Fire Retardant Paint, a state-of-the-art solution engineered to provide unparalleled fire protection for steel structures. This advanced paint system combines cutting-edge technology with exceptional performance, offering a comprehensive range of features and benefits.
Designed to withstand the most demanding fire conditions, GT-NSP-FP1.50-BTCB-2 provides robust protection against ordinary building fiber fires. Its intumescent properties enable it to expand when exposed to heat, forming a protective barrier that insulates the steel structure and prevents the spread of flames.
Key features of GT-NSP-FP1.50-BTCB-2 include its water-based formulation, which makes it environmentally friendly, non-toxic, and pollution-free. The paint boasts a thin thickness, ensuring strong adhesion to steel surfaces while maintaining high fire resistance. Its white color does not chemically react with standard anti-corrosion primers, and it emits no irritating odor during application.
Main Feature:
GT-NSP-Fp1.50-BTCB-2 indoor intumescent steel structure fire retardant coating, a testament to cutting-edge innovation in fire protection technology. Crafted as a water-based solution, it sets a new standard with its thin application, unparalleled adhesion, exceptional fire resistance, and aesthetic appeal.
Designed with environmental sustainability in mind, our coating embodies eco-friendly principles while delivering top-notch performance. Its thin application ensures minimal material usage without compromising on efficacy, making it a cost-effective and efficient solution for safeguarding indoor steel structures against fire hazards.
One of its standout features is its strong adhesion properties, ensuring a seamless bond to steel surfaces for long-lasting protection. In the event of a fire, our coating forms a robust insulating char layer, effectively retarding the spread of flames and preserving structural integrity.
Beyond its fire-retardant capabilities, our coating also offers decorative properties, enhancing the visual appeal of indoor spaces while providing essential safety measures. Its versatility makes it suitable for a wide range of applications, from commercial buildings to industrial facilities.
In summary, our GT-NSP-Fp1.50-BTCB-2 indoor intumescent steel structure fire retardant coating represents a groundbreaking advancement in fire protection technology. Combining innovation, sustainability, and versatility, it's the ultimate choice for safeguarding indoor steel structures in a wide variety of environments.
Base treatment and construction methods:
1. Substrate treatment
1.1 Surface treatment of steel structures is the basic condition to ensure the durability of fire retardant coatings. According to different base materials, the surface treatment of steel structures should be as follows:
1.1.1 New ordinary steel structure surface
After the steel structure surface is sandblasted and derusted, a matching anti-rust and anti-corrosion coating is applied. It is recommended to use an epoxy zinc-rich primer + epoxy mica iron intermediate paint system.
1.1.2 Galvanized steel surface
In order to ensure good bonding performance with fire retardant coatings, epoxy coating transition paint must be used before construction.
1.1.3 Old steel structure or old primer surface
If the primer is not damaged and the surface is clean, check the compatibility of the fire retardant coating and the primer; if there is no primer or the primer is seriously damaged, the anti-corrosion coating must be removed and repainted before construction.
1.2 Before construction, thoroughly check whether the steel parts are painted with anti-rust paint, whether there is dust or oil stains, and whether there are cracks and improper welding on the steel beams and columns. Construction can begin only after the inspection shows that there are no problems.
1.3 Steel parts that have not been rust-proofed must be rust-proofed (this process is generally the responsibility of the user).
2. Apply fire retardant paint
2.1 When opening the packaging on site, you must use an electric stirrer to stir until the consistency is uniform. If the material is too thick, add a small amount of neutral water until it is suitable for brushing, but it should not exceed 5% of the paint volume.
2.2 This coating can be applied by brush or roller. Each pass should be applied alternately horizontally and vertically to ensure it is even and smooth.
2.3 Construction temperature and humidity requirements
When applying this paint, it should be used between 5~35℃ and relative humidity ≤80%. High humidity or low temperature will prolong drying time and cause poor film adhesion and reduction of other properties.
2.4 The coating thickness during the first pass of construction shall not exceed 0.2mm.
2.5 After the first coat is basically dry, apply the next coat until the specified thickness is reached. The thickness of each dry film should not be greater than 0.2mm (wet film 0.2-0.3mm).
2.6 Under normal temperature conditions, the interval between each construction should be more than 12 hours; if the temperature is too high or too low, the construction interval can be adjusted appropriately.
2.7 During the use of this product, it is recommended to use alkali-free fiberglass cloth for wrapping. When the coating is constructed to a thickness of about 0.8mm (dry film), wrap the alkali-free fiberglass mesh cloth, with an overlap of 5-10cm between meshes, and add Use a spatula behind the net to compact the net in one direction, paying attention to the compaction of the corners and joints. The next step of construction can only be carried out after full compaction and ensuring that there are no hollow areas.
2.8 High humidity and low gas flow or low steel temperature may cause condensation on the steel, resulting in poor adhesion of the paint, or even cracking, rolling, and peeling.
2.Construction steps and operating points:
3.1 Substrate treatment 3.2. First coat of paint 3.3. Second to nth layer construction 3.4. Self-inspection
Customer Reviews:
"Outstanding Fire Protection": "We've been using GT-NSP-FP1.50-BTCB-2 for our indoor steel structures, and we're incredibly impressed with its fire-retardant capabilities. It provides outstanding protection while maintaining a sleek finish."
"Reliable and Trustworthy": "Working with this fire retardant paint has been a game-changer for our projects. Not only does GT-NSP-FP1.50-BTCB-2 deliver on its promises of fire resistance, but the team behind it has been reliable and trustworthy, ensuring smooth transactions and timely deliveries."
"Excellent Durability": "GT-NSP-FP1.50-BTCB-2 has proven to be an excellent choice for our indoor steel structures. Not only does it offer top-notch fire protection, but its durability is also exceptional. We've seen minimal wear and tear even in high-traffic areas."
"Great Aesthetic Appeal": "One of the things we love about GT-NSP-FP1.50-BTCB-2 is its ability to provide both fire protection and aesthetic appeal. The finish is smooth and sleek, adding to the overall visual appeal of our steel structures."
"Efficient Application and Coverage": "We've found GT-NSP-FP1.50-BTCB-2 to be highly efficient in terms of application and coverage. It goes on smoothly and evenly, and a little goes a long way. This has not only saved us time but also reduced costs."
These are hypothetical testimonials based on the features and advantages of the product. If you need further assistance or want more tailored testimonials, feel free to ask!